Active Exploration Pipeline
Near-term exploration strategy
CU-AU
Mt Isa East
Ardmore North
1,000–1,500m RC program drill-ready for July 2026; heritage survey complete, surface works scheduled June.
Attina
High-grade surface expression (52.8 g/t Au, 12.35% Cu rock chip); mapping and sampling underway to refine targets and determine access.
Grasswren
Coincident VTEM and Cu-in-soil anomaly; environmental approvals obtained, mapping ongoing.
AU
Pyramid Gold
Gettysberg Prospect
Most advanced target with high-grade historic intercepts (35m @ 6.1 g/t Au) and >500m of defined mineralised strike.
Exploration Focus
Follow-up drilling planned to extend known mineralisation along the ~8 km Gettysberg Fault corridor.
Near-Term Objective
Targeting maiden JORC Inferred Resource at Gettysberg as near-term milestone.
